Deep Driven "Steel Pilings"
              Our Technology
  
 

Printable Version
Replaces Drilled/cased Concrete Piers
RAM JACK® Helical Steel Piles
  • No rain delays
  • No holes to drill. Helicals are screwed into load bearing strata & lock up
  • Fast clean installation. No spoils.
  • No cure time. Grade beams can be installed immediately
  • Installed below water table without casings. No crane required
  • Load carried on helix bearing plates
  • Slender shafts reduces heave potential due to skin friction
  • Each pile is tested for bearing capacity by monitoring the torque values
  • Lifetime Warranty
Drilled/cased Concrete Piers
  • Rain stops all work
  • Drill pier holes
  • Must clean up/remove spoils
  • Crane required to install casings
  • Must wait 28 days for concrete to cure before grade beams can be installed
  • Piers must be cased if water table is penetrated
  • Depends on skin friction for bearing
  • Large surface area susceptible to heave failure due to skin friction
  • No way to test during installation
  • One (1) year warranty

RAM JACK® has 53 offices in major markets through out the USA www.ramjack.com