RAM JACK® Helical Steel Piles
- No rain delays
- No holes to drill. Helicals are screwed into load bearing strata & lock up
- Fast clean installation. No spoils.
- No cure time. Grade beams can be installed immediately
- Installed below water table without casings. No crane required
- Load carried on helix bearing plates
- Slender shafts reduces heave potential due to skin friction
- Each pile is tested for bearing capacity by monitoring the torque values
- Lifetime Warranty
|
Drilled/cased Concrete Piers
- Rain stops all work
- Drill pier holes
- Must clean up/remove spoils
- Crane required to install casings
- Must wait 28 days for concrete to cure before grade beams can be installed
- Piers must be cased if water table is penetrated
- Depends on skin friction for bearing
- Large surface area susceptible to heave failure due to skin friction
- No way to test during installation
- One (1) year warranty
|